Real Rust
![](https://www.fleurpaint.com/wp-content/uploads/2019/01/12679_Fleur_Ruggine_Vera_0750L-1200x1200.jpg)
APPLICATION CYCLE:
Step 1: Mix the product Rust (or Light Rust) and apply two coats.
Step 2: Let it dry 2-3 hours between one coat and the other.
Step 3: Apply the Reagent unevenly.
OPTIONAL:
Insulate the surface with the special Primer.
To speed up the oxidation time, mix the colour Rust (or Light Rust) directly with the Reagent in a 1:3 ratio.
Once the desired result is obtained and after letting it dry, apply 2 coats of Anti-Oxidant Finish to stop the oxidation process, waiting 2-4 hours between the layers.
Available Sizes:
![](https://www.fleurpaint.com/wp-content/themes/fleurpaint2018/img/formatos/2.png)
![](https://www.fleurpaint.com/wp-content/themes/fleurpaint2018/img/formatos/3.png)
![](https://www.fleurpaint.com/wp-content/themes/fleurpaint2018/img/formatos/4.png)
Coverage:
130 ml = 1 m2 ca. | 330 ml = 2,6 m2 ca.
0,75 L = 7,5 m2 ca.
0,75 L = 7,5 m2 ca.